Carver County is making upgrades to Lyman Blvd from Highway 41 to Galpin Blvd in the cities of Chaska and Chanhassen.

Highway 18/Lyman Blvd. is a main arterial road for the local community and connector for area businesses. This project will ease traffic congestion and address growing safety concerns for drivers, bicyclists, and pedestrians at the intersections of Lyman Blvd at Highway 41, Peavey Rd, and Norex Drive by removing the existing traffic signal or stop signs and constructing a roundabout at each intersection.

Area improvements include:

  • Better area traffic flow
  • Improved access to local businesses and for residents by minimizing highway crossings in the area
  • Pedestrian/bicycle crossing and accessibility upgrades at the intersections within the project area
  • Trail connections to existing trail systems between Chaska and Chanhassen

Project Videos

Watch the pre-construction drone flyover 

 

Watch the drone flyover of the Highway 41/Lyman Blvd. and Lyman Blvd./Peavey Rd. intersections from June 2020. Click here!

Current Traffic Impacts 

Through June 27, 2020

  • Highway 41 between 82nd St. and Peavey Rd. is closed to traffic for roundabout construction.
    • Highway 41/Lyman Blvd. detour uses Pioneer Trail, Audubon Rd., Lyman Blvd., Galpin Blvd., Highway 5 and Highway 41. See map.
      • Please note: the detour route will add trip time.
  • Lyman Blvd. from Highway 41 to Norex Dr. is closed to traffic for roundabout construction at the intersection of Lyman Blvd./Peavey Rd.
    • Peavey Rd. detour uses Audubon Rd., Pioneer Trail and Highway 41. See map.
  • Highway 41 businesses located between Peavey Rd. and Lyman Blvd. will continue to use Highway 41 to access their driveway during construction. 

Upcoming Traffic Impacts

5 p.m. Saturday, June 27 through Fall 2020:

  • Lyman Blvd. from Peavey Rd. to Galpin Blvd. is closed to traffic.
    • Detour uses Galpin Blvd., Highway 5 and Highway 41. See map.

What to Expect

  • Traffic impacts, road closures and detours during construction
  • Businesses will remain open and accessible during construction
    • Temporary route changes to some businesses to get around road closures

Anticipated Project Schedule 

Mid-April through June 27, 2020:

  • Highway 41/Lyman Blvd. intersection is closed to traffic.
    • Detour uses Pioneer Trail, Audubon Rd., Lyman Blvd., Galpin Blvd., Highway 5 and Highway 41. See map.
    • This intersection will be reconstructed in segments to maintain business access west of Highway 41.
      • Businesses will use a temporary bypass road when construction crews rebuild the north segment of the intersection. Then employees and visitors will use temporary lanes to move through the intersection while the south segment is under construction. 
  • Lyman Blvd. from Highway 41 to Norex Dr. is closed to traffic.

5 p.m. Saturday, June 27 through Fall 2020:

  • Lyman Blvd. from Peavey Rd. to Galpin Blvd. is closed to traffic.
    • Detour uses Galpin Blvd., Highway 5 and Highway 41. See map.

Fall 2020:

  • Finishing touches completed throughout the project area. 

Project Resources

Area residents, commuters, and visitors should know how to navigate the new Lyman Boulevard roundabouts before they are fully operational. Learn more about what you should know before you drive, walk or bicycle in the area.

Public Open House Documents

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer