Carver County is making upgrades to Lyman Blvd from Highway 41 to Galpin Blvd in the cities of Chaska and Chanhassen.

Highway 18/Lyman Blvd. is a main arterial road for the local community and connector for area businesses. This project will ease traffic congestion and address growing safety concerns for drivers, bicyclists, and pedestrians at the intersections of Lyman Blvd at Highway 41, Peavey Rd, and Norex Drive by removing the existing traffic signal or stop signs and constructing a roundabout at each intersection.

Utility relocation will begin in April 2019. Construction will begin in Late Spring 2019 and continue through June 2020.

Area improvements include:

  • Better area traffic flow
  • Improved access to local businesses and for residents by minimizing highway crossings in the area
  • Pedestrian/bicycle crossing and accessibility upgrades at the intersections of Lyman Blvd at Highway 41 and Peavey Rd
  • Trail connections to existing trail systems between Chaska and Chanhassen

View the future rendering of Lyman Blvd. 

Current Traffic Impacts

No current traffic impacts at this time.

What to Expect

More information will be shared prior to construction. 

Maps & Detour Routes

  • Stage 1: Lyman Blvd from west of Norex Drive to Galpin Blvd will be closed to traffic.
    • See construction limits and designated detour route.
  • Stage 2: Highway 41 between Peavey Rd and 82nd St will be closed to traffic. Local businesses will remain accessible during this time.
    • See construction limits and designated detour route.
  • Stage 3: Lyman Blvd from Highway 41 to east of Peavey Rd will be closed to traffic.
    • See construction limits and designated detour route.

Lyman Boulevard between Highway 41 and Galpin Boulevard will be closed from May to August 2019 for construction. The detour is Highway 41 to Highway 5 to Galpin Boulevard to Lyman Boulevard.

Anticipated Project Schedule

Early Spring 2019:

  • Utility relocations

Late Spring 2019:

  • Stage 1 construction begins

Mid-Summer – November 2019:

  • Highway 41 is closed to traffic between Peavey Rd and 82nd St
  • Designated detour route is Highway 41, Highway 5, Galpin Blvd, Lyman Blvd, Audubon Rd, and Pioneer Trail.

Late Fall 2019:

  • Stages 1 & 2 are complete 

Spring - June 2020:

  • Stage 3 construction 

Public Open House Documents

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer